Agent/ Attorney Address Line 1:1575 S Grandridge Ave
Agent/ Attorney Address Line 2:
Agent/ Attorney City:MONTEREY PARK
Agent/ Attorney State/ Province:CALIFORNIA
Agent/ Attorney Country:UNITED STATES OF AMERICA
Agent/ Attorney Postal Code:91754
Agent/ Attorney Email:jkim@stillerkim.com
Position Info
Prevailing Wage Track Number:P10021133312673
Prevailing Wage SOC Code :17-1011
Prevailing Wage SOC Title :Architects, Except Landscape and Naval
Prevailing Wage Skill Level:Level I
Prevailing Wage:56930
Prevailing Wage Unit of Pay:Year
Prevailing Wage Source:OES
Prevailing Wage Other Source:
Prevailing Wage Determination Date :2021-10-27
Prevailing Wage Expiration Date :2022-06-30
Wage Offer From:62000
Wage Offer To:
Wage Offer Unit of Pay:Year
Workstie Address Line 1:35 E Wacker Drive, Suite 1000
Worksite Address Line 2:
Worksite City :Chicago
Worksite State:ILLINOIS
Worksite Postal Code:60601
Job Title:Designer
Minimum Education:Bachelor's
Other Degree/ Diploma:
Major Field of Study:Architecture (5 year)
Required Training:N
Required Training Month:
Required Field of Training:
Required Experience :Y
Required Expreience Months :24
Accept Alternate Field of Study:N
Accept Alternate Major:
Alternate Combination of Education/ Experience:N
Required Alternate Level of Education :
Other Alternate Level of Education:
Acceptable Years of Experience:
Accept Foreign Educationa:Y
Acceptable Alternate Occupation:N
Acceptable Alternate Occupation Month:
Accept Alternate Job Title:
Normal Requirements of Job Opportunity:Y
Required Foreign Language:N
Specific Skills:Cont. form H.11 conduct BIM organization for all documents, and utilize management tools such as Dynamo efficient production and optimization of the workflow; prepare client and public presentations, workshops, and meetings, using 2D3D CAD and building information modeling programs, including Revit, AutoCAD, Rhino, and SketchUp, analysis and computer skills to develop 3D building computer models and images, and presentation image; work in conjunction with sustainable design leadership in continued improvement and development of highperformance design to maintain and improve quality and consistency of design environment and deliverables; make corrections as indicated by the Project Architect to inprogress sets of design development and construction documents; conduct construction administration via site visits and issuance of field reports, punch list, and detailed review of subcontractors shop drawings, submittalscut sheets on materials equipment, review of structural construction for architectural coordination, HVAC system layout and installation, installation of lighting fixtures, and installation of electrical equipment.br br Requires Bachelor of Architecture 5 year or foreign equivalent plus 2 years of experience to include assisting with programming, strategic planning, phasing, predesign, and design phases of aviation and transportation facilities, including new construction, renovation, tenant improvement, and master planning; meeting with client representatives for presentations and workshops, analysis of goals and needs, develop programmed space spreadsheets, narrative summaries, room data sheets, adjacency diagrams, graphic content, and prepare final Developed Project Program document; researching domestic and international building codes, zoning regulations, collecting data, assemble reports, and presentations to incorporate research and data into architectural designs; preparing design criteria for aviation and transportation facilities, conducting research of aviation industry standards and trends, federal aviation regulations, airport research programs, and incorporating them into campus design criteria and architectural designs; surveying and researching existing baggage systems in aviation facilities, coordinating with baggage design consultants and other disciplines to develop baggage system approach for incorporation into architectural designs; participating in discussions with clients and consultants, coordinating communication between licensed Architects, design principal and other internal and external team members as well as clients during the evolving of the design; utilizing BIM specialty to produce and document the phasing alternate of large airport modernization projects to allow continued operations of airport throughout construction; coordinating with airfield consultant, civil engineers, and senior architect to provide viable solutions for airport; working closely with project manager and other team members, coordinating project program requirements and design effort to achieve project goals within target budget, produce Intergraph to document and track existing program area, current program area, target program area, and difference between them during daytoday design progress, and using those data to facilitate program effort, presentations and report; conducting site survey of existing conditions programs, processing capacity, tenants and owner information, special operation functions, collecting, and documenting asbuilt drawings, building document dictionary per clients needs; building 3D site digital massing by using Sketchup, Rhino, Navisworks, for further studies, incorporating data from Mattport scan and point cloud in recap for modeling accuracy; designing and building large scale building models by handmaking or using 3d printer, and utilize SLA, SLS printer, or CNC machines to meet the needs of different projects; Cont. in K.9 Job 1
Combination Occupation :N
Offered to Applied Foreign Worker:Y
ForeignWorker Live on Premises :N
Live in Domestic Service Worker:N
Employment Contract :
Professional Occupation :Y
College/ University Teacher:N
Competitive Process:
Basic Recruitment Process :
Teacher Select Date:
Teacher Publish Journal Name:
Additional Recruitment Information:
Job Oder Start Date:2021-12-02
Job Oder End Date:2022-01-04
Sunday Edition Newspaper:Y
First Newspaper Name:Chicago SunTimes
First Advertisement Start Date:2021-12-12
Second Newspaper Name:Chicago SunTimes
Second Advertisement Type:Newspaper
Second Ad Start Date:2021-12-19
Job Fair From Date:
Job Fair to Date:
On Campus Recruiting from Date:
On Campus Recruiting to Date:
Employer Website from Date:2021-12-02
Employer Website to Date:2022-01-04
Pro. Org. Ad from Date:
Pro.Org. Ad to Date:
Job Search Website from Date:2021-12-02
Job Search Website to Date:2022-01-04
Private Employment Firm from Date:
Pricate Employment Firm to Date:
Employee Referral Program from Date:2021-12-02
Employee Referral Program to Date:2022-01-04
Campus Placement from Date:
Campus Placement to Date:
Local Ethnic Newspaper from Date:
Local Ethnic Newspaper to Date:
Radio/TV Ad from Date:
Radio/TV Ad to Date:
Employer Received the Payment:N
Payment Details:
Bargaining Representative Notified:N/A
Posted Notice at Worksite:Y
Layoff in Past Six Months:N
US Worker Considered:
Country of Citizenship:CHINA
Foreign Worker Birth Country:CHINA
Class of Admission :H-1B
Employee Info
Foreign Worker Education:Master's
Foreign Worker Education Other:
Foreign Worker Major:ARCHITECTURE
Year of Compelted Education:2016
Foreign Worker Istitution of Eduation:ILLINOIS INSTITUTE OF TECHNOLOGY
Foreign Worker Education Instution Address Line 1:10 WEST 35TH STREET
Foreign Worker Education Institution Address Line 2:
Foreign Worker Education Institution City:CHICAGO
Foreign Worker Educatution Institution State:IL
Foreign Worker Education Institution Country :UNITED STATES OF AMERICA
Foreign Worker Education Training Post Code:60616
Foreign Worker Training Completion :N/A
Foreign Worker Required Experience :Y
Foreign Worker Alternate Education and Experience :N/A