Previous State Work Force Agency (SWA) Case Number Stete:
Schedule A or a Sheepherder Occupation :N
Company Info
Employer Name:HELLMUTH OBATA KASSABAUM, INC.
Employer Address_Line 1:10 SOUTH BROADWAY, SUITE 200
Employer Address_Line 2:
Employer City :ST. LOUIS
State:
Employer State/ Province:MISSOURI
Employer Country:UNITED STATES OF AMERICA
Employer Postal Code:63102
Employer Phone No.:314 421 2000
Employer Phone Extent No.:
Total Number of Employees:1531
Employer Year of Commenced :
NAICS Code:541310
Foreign Worker Ownership & Interest:N
HR Info
Employer Contact Name:Marti Stubblefield
Employer Contact Address Line1:10 South Broadway, Suite 200
Employer Contact Address Line2:
Employer Contact City:St. Louis
Employer Contact State/ Provice:MISSOURI
Employer Contact Country :UNITED STATES OF AMERICA
Employer Contact Post Code:63102
Employer Contact Phone:314 754 4021
Employer Contact Email:marti.stubblefield@hok.com
Attorney
Agent/ Attorney Name:Jean Kim
Agent/ Attorney Firm Name:Stiller Kim, PC
Agent/ Attorney Phone:2132237188
Agent/ Attorney Phone Ext.:112
Agent/ Attorney Address Line 1:800 West Sixth Street Suite 1020
Agent/ Attorney Address Line 2:
Agent/ Attorney City:Los Angeles
Agent/ Attorney State/ Province:CALIFORNIA
Agent/ Attorney Country:UNITED STATES OF AMERICA
Agent/ Attorney Postal Code:900172713
Agent/ Attorney Email:jkim@stillerkim.com
Position Info
Prevailing Wage Track Number:P10020002229647
Prevailing Wage SOC Code :17-1011
Prevailing Wage SOC Title :Architects, Except Landscape and Naval
Prevailing Wage Skill Level:Level I
Prevailing Wage:49483
Prevailing Wage Unit of Pay:Year
Prevailing Wage Source:OES
Prevailing Wage Other Source:
Prevailing Wage Determination Date :2020-04-07
Prevailing Wage Expiration Date :2020-07-06
Wage Offer From:64002
Wage Offer To:
Wage Offer Unit of Pay:Year
Workstie Address Line 1:201 North Franklin Street, Suite 1800
Worksite Address Line 2:
Worksite City :Tampa
Worksite State:FLORIDA
Worksite Postal Code:33602
Job Title:Senior Designer
Minimum Education:Bachelor's
Other Degree/ Diploma:
Major Field of Study:Architecture (5 year)
Required Training:N
Required Training Month:
Required Field of Training:
Required Experience :Y
Required Expreience Months :12
Accept Alternate Field of Study:N
Accept Alternate Major:
Alternate Combination of Education/ Experience:N
Required Alternate Level of Education :
Other Alternate Level of Education:
Acceptable Years of Experience:
Accept Foreign Educationa:Y
Acceptable Alternate Occupation:N
Acceptable Alternate Occupation Month:
Accept Alternate Job Title:
Normal Requirements of Job Opportunity:Y
Required Foreign Language:N
Specific Skills:Bachelor of Architecture 5 year or foreign equivalent plus 1 year of experience to include assisting in predesign and all phases of commercial projects, including new construction, renovation, interiors, site planning and tenant improvement; meeting with clients for presentations, analysis of goals and needs, developing programmed graphic content, and preparing project document; applying own judgement, analysis and spreadsheet skills to accurately and precisely develop space plans, feasibility studies, and code analysisreviews; providing detailed analysis of largescale multidepartment program documentation; providing detailed space planning utilizing stacking and blocking skills and techniques to develop the program for large scale multidepartment program based on clients functional and spatial requirements; reviewing existing conditions within a workplace to determine feasibility of programmed changes; developing site analysis studies requiring site photography, code research, base drawings and diagrams; applying advanced knowledge of local building codes and research local, domestic and international building codes and regulations to provide code review of space plans to determine feasibility; coordinating team in planning work and developing solutions to technical and design detail problems; utilizing knowledge of construction systems and developed documents including documenting architectural plans, elevations, and details using 2D3D modeling using Revit, AutoCAD, Sketchup, and related BIM, 2D and 3D modeling software; making corrections as indicated by Sr. Project Architect and Project Manager to inprogress sets of design development and construction documents; performing periodic quality assurance and quality control checks throughout the construction documentation phase; producing renderings for client presentations using Photoshop, Illustrator CS5, Rhinoceros 5, Grasshopper, Artlantis Studio 4, Lumion, and InDesign; coordinating with consultants including civil, mechanical, electrical, plumbing, and structural to incorporate building systems into architectural designs; applying architectural principles to review all project documentation and processes; setting up project team software parameters and managing standards; utilizing knowledge of sustainable design principles to incorporate high performance design in all project phases; conducting site visits, field observation and meeting with stakeholders to review the progress of construction; providing thorough documentation of all observations and documenting updates; performing necessary modifications of drawings and specifications as construction projects progress and changes in dimensions, materials and other aspects of design arise from client, agency or public input; coordinating project data and transmission and all electronic communication using project information management software; assisting project managers and project architects with managing drawing standards and setting up project team software parameters and manual.
Combination Occupation :N
Offered to Applied Foreign Worker:Y
ForeignWorker Live on Premises :N
Live in Domestic Service Worker:N
Employment Contract :
Professional Occupation :Y
College/ University Teacher:N
Competitive Process:
Basic Recruitment Process :
Teacher Select Date:
Teacher Publish Journal Name:
Additional Recruitment Information:
Job Oder Start Date:2020-07-06
Job Oder End Date:2020-08-07
Sunday Edition Newspaper:Y
First Newspaper Name:Tampa Bay Times
First Advertisement Start Date:2020-07-12
Second Newspaper Name:Tampa Bay Times
Second Advertisement Type:Newspaper
Second Ad Start Date:2020-07-19
Job Fair From Date:
Job Fair to Date:
On Campus Recruiting from Date:
On Campus Recruiting to Date:
Employer Website from Date:2020-06-25
Employer Website to Date:2020-08-07
Pro. Org. Ad from Date:
Pro.Org. Ad to Date:
Job Search Website from Date:2020-06-25
Job Search Website to Date:2020-08-07
Private Employment Firm from Date:
Pricate Employment Firm to Date:
Employee Referral Program from Date:2020-06-25
Employee Referral Program to Date:2020-08-07
Campus Placement from Date:
Campus Placement to Date:
Local Ethnic Newspaper from Date:
Local Ethnic Newspaper to Date:
Radio/TV Ad from Date:
Radio/TV Ad to Date:
Employer Received the Payment:N
Payment Details:
Bargaining Representative Notified:N/A
Posted Notice at Worksite:Y
Layoff in Past Six Months:N
US Worker Considered:
Country of Citizenship:BAHAMAS
Foreign Worker Birth Country:BAHAMAS
Class of Admission :H-1B
Employee Info
Foreign Worker Education:Master's
Foreign Worker Education Other:
Foreign Worker Major:ARCHITECTURE
Year of Compelted Education:2015
Foreign Worker Istitution of Eduation:FLORIDA AM UNIVERSITY
Foreign Worker Education Instution Address Line 1:1415 S M L KING JR BLVD
Foreign Worker Education Institution Address Line 2: